Listed below are details on temporary and permanent lot closures on campus. Areas may be closed due to active construction, lot maintenance, or permanent repurposing of the area. Please note, temporary lot closure time frames may change due to weather or other factors.
Starting March 9th 2026, employee parking lots 56 and 57 will permanently close due to construction of the new Engineering and Digital Innovation Center. Refer to the map highlighting alternative parking options.

May 4th - August 21st 2026, lots 40, 42, and 47 will be closed due to construction on Farm Lane for utility infrastructure installation. Refer to the map to view the effected area.

May 6th - July 24th 2026, lots 302, 303 and half of 73 will be closed for the Wilson Hall – Technology Engineering and Life Safety project. The loading dock will remain open. Refer to the map to view the effected area.

June 5th - June 8th 2026, Life Science loop will be resurfaced. This work is weather permitting and the dates of closure could be impacted. Refer to the map to view the effected area.

June 5th - June 8th 2026, the loading dock area and drive lane to Stadium Road within lot 59 will be resurfaced. This work is weather permitting and the dates of closure could be impacted. Refer to the map to view the effected area.

June 5th - June 10th 2026, drive lanes will be resurfaced in the north and northeast sections of lot 65. This work is weather permitting and the dates of closure could be impacted. Refer to the map to view the effected area.

July 6th - July 13th 2026, lot 38 will be closed to resurface the entire parking area and create a new drive lane access for accessible spaces. Refer to the map to view the effected area.